Progress stage: Environmental impact assessment construction period: 2011-2012 Major equipment: cranes, firefighting facilities, security facilities, water supply and drainage facilities, electrical facilities, building facilities, etc.
Project Profile: The project is located in the east of Zhangliao Road, Xiangcheng District, Zhangzhou City, and is located in the middle and western part of the urban area. The project has a total land area of ​​76.46 mu and a total construction area of ​​50944 square meters. The construction content is residential and commercial machine supporting facilities, of which the residential construction area is 93201. In terms of square meters, the commercial building area is 22200 square meters, the green space rate is 33.1%, the building density is 33.6%, and the floor area ratio is 2.27. After the project is completed, it can provide 820 houses.
The total investment of the project is 2.02 billion yuan.
Construction Unit: Luzhou Chengxin Real Estate Development Co., Ltd. Postal address: Xiangcheng District, Zhangzhou City Post code: 036025
Contact: Manager Liu Tel
Design Unit: Shanxi Province Chemical Design Institute (EIA)
Postal address: No. 48 Gongye Road, Gaoxin District, Taiyuan City, Shanxi Province Postcode: 030032
Contact: Wang Jing Tel: 0351--6063481
Injection Tooling & Mold Built
Injection Tooling & Mold Built,Plastic Part Injection Molding,Parts Injection Molding,Injection Molding
Wisegroup Precison Mold Ltd , https://www.wisegroupasia.com