Good commissioning can make the two-channel three-roller gate run better and more stable. How to debug can be explained from these five aspects.
1. Left single card: After the left card is swiped, the left solenoid valve of the three roller gate is automatically sucked in, and the direction indicator turns into a green traffic sign, waiting for the pedestrian to enter. When the pedestrian enters and pushes the three-roller gate to rotate 60 degrees, the Hall switch effectively triggers the magnet twice, the solenoid valve is opened to complete the locking action, and the traffic indication becomes a red prohibition sign. At the same time, the pedestrian number counter 1 is automatically added to complete a traffic flow.
A: Each travel time is 10 seconds (this parameter can be set by the user). Take 10 as an example. When no one has exceeded the set time, the device will automatically reset and no calculation is required.
B: The travel time of each person should not exceed 10 seconds. If more than 10 seconds later, the system will clear the number of swipes and reset automatically. The traffic control process is the same as a single swipe card.
2. Single swipe card on the right side: After the left card is swiped, the solenoid valve on the left side of the two-channel three-roller brake is automatically sucked in, and the direction indicator light turns into a green traffic sign, waiting for pedestrians to enter. When the pedestrian enters and pushes the three-roller gate to rotate 60 degrees, the Hall switch effectively triggers the magnet twice, the solenoid valve is opened to complete the locking action, and the traffic indication becomes a red prohibition sign. At the same time, the pedestrian number counter 1 is automatically added to complete a traffic flow.
3. Lowering function: After the system is running normally, if the power is suddenly turned off or the manual down button is pressed, the system will automatically lower the release channel.
4. Manual voltage reduction function test: press the manual voltage reduction button, the electromagnet is powered off, and the gate is dropped; after the release, the electromagnet generates electricity, and the manual lifting rod can be used. The method is to clamp the lifting rod to a horizontal position.
5. Communication function test: set and test according to the software communication function of the host computer.
In short, the commissioning of the two-channel three-roller gate is an important part of the installation. It can check if the gate is working properly before installation. If there is any abnormality, you can return to the factory for repair. Good inspection can make the dual-channel three-roll gate reflect its value in the future work, reduce the failure rate and serve the public.
Brake Parts,Rubber Parts,Drive Shaft Rubber Boot,Rubber Shaft Boot
NINGBO ZHIJIA , https://www.zjparts.com