Rain test chamber use and maintenance

The rain test chamber is suitable for external lighting and signaling devices and automotive lamp enclosure protection, and can provide various environments for realistic simulation of electronic products and their components that may be subjected to water spray and spray tests during transportation and use. In order to achieve the waterproof performance of various products.

Note for the rain test box:

1. When an unexpected sound is heard during operation, it is necessary to stop the inspection. It is only necessary to restart the power after the fault is resolved, so as not to affect the service life of the equipment.

2. The transmission mechanism must be refueled regularly. The reducer must be cleaned with 20# oil.

3. After the equipment is positioned, the support frame should be propped up to prevent the casters from being displaced after being shocked during the test.

4. The rain test box runs for a long time. If the spray hole is blocked, the pipeline must be removed, rinsed with tap water and assembled.

     Maintenance measures for the rain test chamber:

1. Check if there is enough water in the water tank before running. If it is not, please fill it first (you must add clean tap water) to avoid damage to the water pump;

2. If you hear an abnormal sound during operation, please stop the machine and wait until the fault is resolved before restarting, so as not to affect the service life of the equipment;

3. When the equipment is not working, it should be kept dry, drain the water after running, and dry the studio and the cabinet;

4. The equipment runs for a long time. If the water spray hole is blocked, the pipeline must be removed, rinsed with tap water and assembled.

5. Avoid dust intrusion into the equipment, after use, cover the plastic cover;

6. Avoid external impact on the equipment;

7. Prohibit the exposure of chemicals to this equipment;

8. Check the circuit control system before each power-on;

9. A ventilation fan should be installed in the laboratory to keep the room ventilated;

10. Confirmation of power supply and grounding wire;

11. The power cord is properly connected according to the specifications and is grounded.

12. The wastewater discharge system of the equipment must be installed in place.

13. After the test is finished, cut off the power of the whole machine;

14. After each test, remove the sample and clean the equipment liner.

Sound Barrier

A noise barrier (also called a soundwall, sound berm, sound barrier, or acoustical barrier) is an exterior structure designed to protect inhabitants of sensitive land use areas from noise pollution. Noise barriers are the most effective method of mitigating roadway, railway, and industrial noise sources – other than cessation of the source activity or use of source controls.

Specification of sound barrier:
1.Material: PC Acrylic board, plastic panle, steel sheet or aluminium sheet
2.Inner material:Glass wool
3.Sheets thickness:0.8-1mm, can be customized
4.Panel size:Width-500mm, Length2000mm, can be customized

5.Packaging Detailssteel pallet and plastic film

Material

Width

Length

Thickness

Acrylic board :PE PMMA resin
Frame material : Aluminum Alloy

100mm-1500mm

2000-2500mm

8mm-10mm


Frame: 70mm-100mm

Metal sheet :aluminiun steet or galvanized steel sheet

Inner Material:Glass wool

500mm-1000mm

2000mm-4000mm

70mm-100mm

Sound Barrier,Sound Barrier Construction,Construction Sound Barrier,Road Sound Barriers

Anping shengsen metal wire mesh products co,. ltd , https://www.apshengsen.com