Model NO.: SC-25
Runner: Cold Runner
Design Software: UG
Installation: Fixed
Certification: TS16949, CE, ISO, FDA
Standard: DME
Customized: Customized
Feature: Easy Installation
Aluminium Color: Custom
Material: Plastic
Customization: Yes
Trademark: OEM
Transport Package: 1 Set with Poly Bag Several Sets in a Brown Carto
Specification: Normal size or custom sizes
Origin: Zhejiang China
Model NO.: SC-25
Runner: Cold Runner
Design Software: UG
Installation: Fixed
Certification: TS16949, CE, ISO, FDA
Standard: DME
Customized: Customized
Feature: Easy Installation
Aluminium Color: Custom
Material: Plastic
Customization: Yes
Trademark: OEM
Transport Package: 1 Set with Poly Bag Several Sets in a Brown Carto
Specification: Normal size or custom sizes
Origin: Zhejiang China
Â
Cavity Material | 1.2738,1.2343, 1.2344, S7, H13, P20HH, GS738H, LKM738H, 718, 8407, S136, Calmax 635 NAK80, Â SKD-61,NIMAX, 45#, 50#, Aluminum for prototype mold etc. |
Runner | Cold runner or Hot runner :YUDO/ HUSKY/MOLD-MASTER/SYNVENTIRE/INCO/ MASTIP/ HASCO/ DME |
Gate | Submarine gate, tunnel gate, side/edge gate, direct gate, pin point gate, sprue gate, diaphragm gate, fan gate, cashew gate, hook gate, hot tip, hot drop, valve gate etc. |
Plastic material for parts | PS, SAN, PA, POM, ABS, PP, PET, PC, PE, HDPE, PA66+GF, PVC, TPE, TPU, TPV etc |
Process | CNC, high speed carve, EDM ,wiring-cutting, drill, polish etc |
Lead Time | 10-30 work days depends on the structure and size of products  |
Package | Wooden Case Package or according to customer requirement |
Â
Â
Cavity Material | 1.2738,1.2343, 1.2344, S7, H13, P20HH, GS738H, LKM738H, 718, 8407, S136, Calmax 635 NAK80, Â SKD-61,NIMAX, 45#, 50#, Aluminum for prototype mold etc. |
Runner | Cold runner or Hot runner :YUDO/ HUSKY/MOLD-MASTER/SYNVENTIRE/INCO/ MASTIP/ HASCO/ DME |
Gate | Submarine gate, tunnel gate, side/edge gate, direct gate, pin point gate, sprue gate, diaphragm gate, fan gate, cashew gate, hook gate, hot tip, hot drop, valve gate etc. |
Plastic material for parts | PS, SAN, PA, POM, ABS, PP, PET, PC, PE, HDPE, PA66+GF, PVC, TPE, TPU, TPV etc |
Process | CNC, high speed carve, EDM ,wiring-cutting, drill, polish etc |
Lead Time | 10-30 work days depends on the structure and size of products  |
Package | Wooden Case Package or according to customer requirement |
Â
Universal Lathe,Duty Engine Lathe,Large Engine Lathe,Large Engine Lathes
Ningbo Yien Machinery Co., Ltd , https://www.yiencnc.com