Project Name: Ceramic Industrial R&D Design Service Center of Yidu Industrial Park (January 2012 - January 2013, RMB 31 million)
Progress phase: filing and construction cycle: January 2012 to January 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, and lighting facilities.
Project Profile: The project is located in the Shilipu Industrial Park in Yidu City. It has built 3,600 square meters of R&D and design houses and purchased 18 sets of design and R&D equipment.
The total investment of the project is 31.5 million yuan, of which 13.5 million yuan is owned by enterprises and institutions, bank loans are 15 million yuan, and other funds are 3 million yuan.
Design Unit: Yidu Huiyi Ceramics Co., Ltd. Postal address: No. 184, Textile Road, Yicheng City, Hubei Province Post Code: 443300
Phone 0717-4839989
Progress phase: filing and construction cycle: January 2012 to January 2013 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, and lighting facilities.
Project Profile: The project is located in the Shilipu Industrial Park in Yidu City. It has built 3,600 square meters of R&D and design houses and purchased 18 sets of design and R&D equipment.
The total investment of the project is 31.5 million yuan, of which 13.5 million yuan is owned by enterprises and institutions, bank loans are 15 million yuan, and other funds are 3 million yuan.
Design Unit: Yidu Huiyi Ceramics Co., Ltd. Postal address: No. 184, Textile Road, Yicheng City, Hubei Province Post Code: 443300
Phone 0717-4839989
Related Developments: Tower Crane Infrastructure Project
High Voltage Transmission Line
We have got 220kV Transmission Line Steel Pole Quality Certificate from Power Industry Steel Tower Qualified Inspection & Test Center from 2001 year.
Our steel poles are made from quality sheet through bending, forming, automatic welding and hot galvanization. We can reach one-run machining length of 14m and can bend sheet of thickness up to 45mm. We adopt advanced welding procedures, automatically weld main joints and reach rank-II welding quality. We supply more than 4000ton Substation Structure for our clients every year.
Transmission Line Steel Pole, Utility Pole, Steel Tubular Pole, High Voltage Transmission Line
Jiangsu Xinjinlei Steel Industry Co., Ltd. , https://www.steelpolejl.com